Photos by Phillip Pessar show the downtown Miami construction site of the 501 First tower.
Groundbreaking for the tower took place in December 2022. The foundation was poured in July.
The 40-story tower is being built without a parking garage.
It will include 448 residential condos allowing short-term rental, along with 3,198 square feet of retail.
The ground level is being designed with wide sidewalks and greenery to provide shade and a usable pedestrian space.
Revuelta is the architect.
Aria Development Group and Aqarat are the developers.
(photos: Phillip Pessar)