Construction Continues At 36-Story 2000 Biscayne, Shell At Level 27

Construction is continuing at the 2000 Biscayne apartment tower in Edgewater.

As of today, shell contractors appear to have reached level 27.

2000 Biscayne is planned to top off at 36 stories, or 408 feet above ground.

The tower will include 393 rental apartments, 455 parking spaces, and 4,569 square feet of retail.

Kushner Companies is the developer.

 

 

(photos: Phillip Pessar)

 

 

24 Comments
most voted
newest oldest
Inline Feedbacks
View all comments
Melo, a former giga Chad
20 days ago

Things needed for Edgewater:
1) pedestrian bridges over the tracks to Wynwood
2) Tram to loop Wynwood, midtown and Edgewater together with Omni station
3) More office space and bars/restaurant

Trolley Rider
20 days ago

The Miami Trolley Wynwood route connects Midtown/Wynwood to the Omni Station. The Biscayne Route also goes to Omi Station and connects Edgewater/Midtown.

Anonymous
20 days ago

Tram? We need Metromover stops!

Anonymous
19 days ago

Edgewater also needs one continuous baywalk and bayside bike path.

El Nalgon
19 days ago

100%. Even if it requires reclaiming like 10ft of the bay. It’s not that deep!

Anonymous
19 days ago

It floods anyway they need a sea wall and it can be built out to be a walkway! Edgwater needs a lot of work.

Not Anonymous
20 days ago

Development like this in the area between Midtown Edgewater and Wynwood will help link the areas together, and hopefully help revitalize it. Out with the strip malls!

Anonymous
20 days ago

It’s amazing that Biscayne Blvd from 17th to 20th Street will have over ten new buildings (I counted twelve).

El Nalgon
19 days ago

Keep going! You have 22 urban, Nema, and those 4 towers going next to paraíso!!!

Michaels
19 days ago

The metromover is long overdue.. It suppose to reach the Design district and beyond, but #becasueMiami.. It may not even happen.. What a shame.. Stop supporting these useless trolleys.. Just more congestion..and absolutely unpredictable service..

Anonymous
20 days ago

it should top off in a couple of months. lots of new residents will be moving to edgewater to this tower and the Nema tower and Metro edgewater Building

BB1
20 days ago

Love the greenery

Anonymous
20 days ago

they used some cheap ugly windows in this project….this building isnt gonna age well

Anon
20 days ago

How can you tell? They look industry standard to me?

Anonymous
19 days ago

the color and size of the frames….maybe theres an design feature that is yet to be unveiled that will help

Downtowner
20 days ago

This part of Edgewater really needs this project.

Anon
19 days ago

This project has been moving super fast

Melo is sigma and chad
20 days ago

Should be occupied by November

Miami Miami
17 days ago

I think the redesign that the PTM developers did here is amazing. This was going to be a terrible looking building when it first got submitted to the City. Does anyone remember that? They also are building the site next door.

Name
14 days ago

Looks very dull for 2023. 1996 called and wants their stucco building back.

Anonymous
20 days ago

Should’ve been double the height

Anonymous
20 days ago

Edgewater is not aging well. The whole paradiso(more like hell) is dated already.

Anon
19 days ago

Aging well…? Edgewater has not even been built out yet…?

Paul
19 days ago

We are good like that. We don’t need more.