Construction is now underway at the 58-story Downtown 6 tower, according to the SFBJ.
Completion is expected in about two years, the report said.
The tower is being built on the same block where the two 52-story Downtown 5th towers were completed in 2021 by the same developer. A total of 1,042 apartments are included in those towers.
Also on the same block, the 70-story Okan tower is now at the third level of construction.
Downtown 6 is planned to rise 574 feet above ground, or 587 feet above sea level, and include:
- 824 apartments
- 2,247 square feet of retail
- 639 parking spaces, in a hidden garage
Melo Group is the developer.