Miami Worldcenter developers are requesting permission to install two tower cranes at the Paramount construction site.
The two cranes are:
- Paramount southwest crane – 790 feet above ground, 799 feet above sea level
- Paramount northeast crane – 700 feet above ground, 709 feet above sea level
Installation of the cranes is tentatively scheduled for November 1.
The developers also signed a deal for water and sewer service at the Parcel D-East portion of the development. It will include:
- 30,000 square feet of retail
- 30,000 square feet of restaurant
Nitin Motwani signed the utilities deal on September 26.
worldcenter parcel-d east: